Centennial Lightening Bolts Photo
December 27, 2008
Installed the wood stove, hearth, chimney, pipe, etc.
Built half walls in bunkhouse
December 13, 2008
Installed the final overhead door segment
Worked on door spring assembly
Installed the bunkhouse trim caps
Built a floor joist metal cover
November 8 - 9, 2008
Finished hanging all wall metal
Installed all gutters
Bolted on my $50 deck
Ate prime rib, drank beer and shot pool
October 30, 2008
Almost finished hanging the east wall metal
Built skirting and hung flashing
Finished the south pitch
Installed the last four ridge caps
Scored some free flagstone for the hearth
Got a good nights rest and ate B&G at the Friendly Cafe
October 9, 2008
Did odds and ends
Worked on ridge cap and corner trim
Hung one gutter and filled OSB gaps
Chris lit the stove to cure the paint
July 24 - 25, 2008
Built the bunkhouse !!
Installed the floor joists and subfloor
Built walls and hung trusses
Sheeted the walls and roof with OSB
Installed the door and windows
Installed the metal roof
A big thanks the Matt, Bryce and Brian
June 14, 2008
Installed 4 of the 5 door panels
Hung 3 of the 4 tracks
Enjoyed the campfire the night before
Thanks Bryce and Meg for the Green Chili Beer
May 30, 2008
Dug six holes and leveled the tubes
Poured concrete into the tubes
Set the floor brackets
Hung out with Chris
January 21, 2008
Worked on more of the barn front panel and trim
Finished the clear Propanel
Hickam installed my electric panel, sockets and wire
January 10, 2008
Finished installing the eave trim metal
Installed more clear Propanel and finished the west side
Wind had 60 mph gusts, so I had to work on the east side
December 28, 2007
Worked on the pitch walls and trim metal
Installed more clear Propanel
Temperature was at 0 degrees all day
Windchill was 30 below
November 3, 2007
Finished the metal walls in front
Started the clear Propanel and trim metal
OSB'd the peaks, installed door handles
Parked the RV inside for maximum protection
October 24, 2007
Installed the walk-through door and the rest of the OSB
Finished with the flashing
Had to leave early as Beth's appendicitis called
October 6, 2007
Installed OSB and exterior metal on two sides
Snowed and rained most of the afternoon
Thanks again to Chris
September 14, 2007
Installed the Trusses and Metal Roof
Thanks to Doug Benton for invaluable assistance
September 8, 2007
Finished planting the treated posts and nailing up the runners
Thanks to Chris for his help and workmanship
September 3, 2007
Planted the first six posts and nailed up runners
Thanks to Chris for the hole cleaning and construction help
August 10 - 11, 2007
I leveled the pad, removed rocks, and drilled 10 holes for the pole barn
July 21, 2006
We closed on the purchase of the property