Installed the wood stove, hearth, chimney, pipe, etc.

Built half walls in bunkhouse

 

122708_stove_1.jpg (400354 bytes) 122708_stove_2.jpg (324783 bytes) 122708_stove_3.jpg (468150 bytes) 122708_bhouse.jpg (298285 bytes) 122708_drift.jpg (283298 bytes)

 

December 13, 2008

Installed the final overhead door segment

Worked on door spring assembly

Installed the bunkhouse trim caps

Built a floor joist metal cover

 

121308_bunk1.JPG (307998 bytes) 121308_door1.JPG (239132 bytes) 121308_door2.JPG (214077 bytes) 121308_trim1.JPG (134821 bytes) 121308_trim2.JPG (148139 bytes) 121308_trim3.JPG (181401 bytes) 121308_nap.JPG (430942 bytes)

 

November 8 - 9, 2008

Finished hanging all wall metal

Installed all gutters

Bolted on my $50 deck

Ate prime rib, drank beer and shot pool 

 

110908_bh10.JPG (337758 bytes) 110908_bh9.jpg (264562 bytes) 110908_bh8.JPG (335822 bytes) 110908_bh7.JPG (355938 bytes) 110908_bh6.JPG (384543 bytes)

110908_bh5.JPG (304236 bytes) 110908_bh4.JPG (302213 bytes) 110808_bh3.jpg (188351 bytes) 110808_bh2.JPG (358648 bytes) 110808_bh1.JPG (349646 bytes)

 

 

October 30, 2008

Almost finished hanging the east wall metal

Built skirting and hung flashing

Finished the south pitch

Installed the last four ridge caps

Scored some free flagstone for the hearth

Got a good nights rest and ate B&G at the Friendly Cafe

 

103008_cent1.JPG (545265 bytes) 103008_cent2.JPG (417639 bytes) 103008_cent3.JPG (271020 bytes) 103008_cent4.JPG (280455 bytes)

103008_cent5.JPG (295503 bytes) 103008_cent6.JPG (359240 bytes) 103008_cent7.JPG (347293 bytes) 103008_cent8.JPG (266079 bytes)

 

 

October 9, 2008

Did odds and ends

Worked on ridge cap and corner trim

Hung one gutter and filled OSB gaps

Chris lit the stove to cure the paint

 

100908_gutter.JPG (219014 bytes) 100908_trim1.JPG (262292 bytes) 100908_trim2.JPG (261394 bytes) 100908_stove.JPG (566325 bytes) 100908_harold.JPG (473556 bytes)

 

 

July 24 - 25, 2008

Built the bunkhouse !!

Installed the floor joists and subfloor

Built walls and hung trusses

Sheeted the walls and roof with OSB

Installed the door and windows

Installed the metal roof

A big thanks the Matt, Bryce and Brian

 

072508_bunkhouse23.jpg (296551 bytes) 072508_bunkhouse22.JPG (301947 bytes) 072508_bunkhouse21.JPG (400514 bytes) 072508_bunkhouse20.JPG (297196 bytes) 072508_bunkhouse19.JPG (380245 bytes)

072508_bunkhouse18.JPG (485009 bytes) 072508_bunkhouse17.JPG (310352 bytes) 072508_bunkhouse16.JPG (340600 bytes) 072508_bunkhouse15.JPG (296765 bytes) 072508_bunkhouse14.JPG (295016 bytes) 072508_bunkhouse13.JPG (274571 bytes)

072508_bunkhouse12.JPG (430248 bytes) 072508_bunkhouse11.JPG (275289 bytes) 072508_bunkhouse10.JPG (435055 bytes) 072508_bunkhouse9.JPG (402071 bytes) 072508_bunkhouse8.JPG (298495 bytes) 072408_bunkhouse7.JPG (311492 bytes)

072408_bunkhouse6.JPG (405496 bytes) 072408_bunkhouse5.JPG (422431 bytes) 072408_bunkhouse4.JPG (466680 bytes) 072408_bunkhouse3.JPG (317709 bytes) 072408_bunkhouse2.JPG (454580 bytes) 072408_bunkhouse1.jpg (178336 bytes)

 

 

June 14, 2008

Installed 4 of the 5 door panels

Hung 3 of the 4 tracks

Enjoyed the campfire the night before

Thanks Bryce and Meg for the Green Chili Beer

 

061408_door1.JPG (649242 bytes) 061408_door2.JPG (1006415 bytes) 061408_door3.JPG (663578 bytes) 061408_door4.JPG (737680 bytes)

 

 

May 30, 2008

Dug six holes and leveled the tubes

Poured concrete into the tubes

Set the floor brackets

Hung out with Chris 

 

053008_tubes1.JPG (469583 bytes) 053008_tubes2.JPG (583875 bytes) 053008_tubes3.JPG (542536 bytes) 053008_tubes4.JPG (463724 bytes) 053008_tubes5.JPG (575190 bytes) 053008_tubes6.JPG (599036 bytes) 053008_tubes7.JPG (274750 bytes)

 

 

January 21, 2008

Worked on more of the barn front panel and trim

Finished the clear Propanel

Hickam installed my electric panel, sockets and wire

 

 

 

January 10, 2008

Finished installing the eave trim metal

Installed more clear Propanel and finished the west side

Wind had 60 mph gusts, so I had to work on the east side

 

 

 

December 28, 2007

Worked on the pitch walls and trim metal

Installed more clear Propanel

Temperature was at 0 degrees all day

Windchill was 30 below

 

122807_pbarn3.jpg (252982 bytes) 122807_pbarn2.jpg (251974 bytes) 122807_pbarn1.jpg (287360 bytes)

 

 

November 3, 2007

Finished the metal walls in front

Started the clear Propanel and trim metal

OSB'd the peaks, installed door handles

Parked the RV inside for maximum protection

 

110307_pbarn1.jpg (415677 bytes) 110307_pbarn2.jpg (315459 bytes) 110307_pbarn3.jpg (220302 bytes) 110307_pbarn4.jpg (186010 bytes) 110307_pbarn5.jpg (301327 bytes)

 

 

October 24, 2007

Installed the walk-through door and the rest of the OSB

Finished with the flashing

Had to leave early as Beth's appendicitis called

 

102407_door2.jpg (413856 bytes) 102407_door3.jpg (282098 bytes) 102407_door1.jpg (303260 bytes)

 

 

October 6, 2007

Installed OSB and exterior metal on two sides

Snowed and rained most of the afternoon

Thanks again to Chris

 

100607_pbarn_04.jpg (244797 bytes) 100607_pbarn_03.jpg (286906 bytes) 100607_pbarn_02.jpg (284987 bytes) 100607_pbarn_01.jpg (382527 bytes) 100607_pbarn_05.jpg (461171 bytes)

 

 

September 14, 2007

Installed the Trusses and Metal Roof

Thanks to Doug Benton for invaluable assistance

 

September 8, 2007

Finished planting the treated posts and nailing up the runners

Thanks to Chris for his help and workmanship

 

September 3, 2007

Planted the first six posts and nailed up runners

Thanks to Chris for the hole cleaning and construction help

 

August 10 - 11, 2007

I leveled the pad, removed rocks, and drilled 10 holes for the pole barn

 

July 21, 2006

We closed on the purchase of the property